Identify the substrate and existing finish.
Ask which boards remain and what is known about their coating. Have the contractor assess the preparation needed for the selected finish system.
Decks · Normandy Park, Washington
Decks in Normandy Park should identify whether the proposed surface will receive a coating or stain and which system is appropriate for the actual material. Discuss the finish before treating every wood and composite surface as ready for the same application.
Evergreen Home Pro helps you define that finishing task. Describe any existing coating and ask which preparation, selected products and future care responsibilities are included in the proposal.

Deck building
Have the contractor review the deck material and finish manufacturer’s instructions together. A color sample alone does not establish compatibility, preparation requirements or the appearance over a retained coating.
Ask which boards remain and what is known about their coating. Have the contractor assess the preparation needed for the selected finish system.
Keep the stain or coating and its intended use identifiable. Do not assume a product suitable for one deck material is approved for another.
Clarify who performs the included finish work and supplies the care instructions. Discuss future renewal under the selected product’s guidance instead of promising a maintenance-free surface.
Before work begins
The city’s residential deck and porch guide provides construction and site-plan information. Identify any board, guard, support or footprint changes when confirming the review needed for the actual project.
A finish-selection discussion does not classify structural construction. Keep coating work and changes to the deck assembly clearly described as separate parts of the scope.
Follow the actual deck and finish manufacturers’ instructions and have compatibility assessed.
Ask the contractor to assess the existing finish and discuss a representative sample of the proposed preparation and product.
No. Identify construction changes separately and confirm the applicable city review.
Tell us the surface material, existing coating and any construction changes proposed alongside finishing.