Identify the delivered units.
Ask whether the proposal supplies separate windows, factory-joined assemblies or subgroups that need further joining. Keep the delivery description tied to the approved combination drawing.
Windows · Pacific, Washington
Window replacement in Pacific should explain how a proposed group of windows is assembled. Ask which units arrive joined, which connections are completed on site and who supplies the joining system before treating adjacent products as one ready-to-install package.
Evergreen Home Pro helps you clarify that scope. Share the proposed window grouping and ask the supplier and installer to identify the delivered assemblies and work still required at the house.

Window replacement
A drawing of adjacent windows does not establish how they are joined or supplied. Have the supplier and installer confirm the selected product’s permitted combination, delivered parts and installation responsibilities.
Ask whether the proposal supplies separate windows, factory-joined assemblies or subgroups that need further joining. Keep the delivery description tied to the approved combination drawing.
Have the supplier confirm which compatible components are supplied and which installation tasks remain. Do not assume ordinary trim turns independent units into an assessed combination.
Ask who completes the remaining connections and checks the installation against the product instructions. Coordinate the work before the replacement openings are prepared.
Before work begins
Pacific adopts the Washington-amended residential code. Have the responsible designer assess the proposed window combination, opening support and required glass and escape functions with the complete replacement.
Factory assembly does not by itself approve the wall opening or remove applicable city review. Include changed framing and affected finishes when confirming the scope.
Ask the supplier to identify the delivered assemblies and any connections still completed on site.
Have the supplier and installer follow the actual product’s permitted combination and components.
No. Have the opening, support, required functions and applicable city review assessed separately.
Include the proposed grouping and any supplier drawing, plus whether separate units or joined assemblies have been quoted.