Decks · Sequim, Washington

Decks in Sequim, WA.

Decks in Sequim on uneven ground should be described using the actual site levels around the platform. A height measured at the uphill edge may not describe the condition at the downhill side or stairs.

Have the designer record the proposed platform and ground relationship before relying on a low-deck exemption. Keep that permit question separate from the construction’s structural, guard and setback requirements.

Gouache illustration of a silver-brown wood deck with bronze guards beside an apricot courtyard home.

Deck building

Assess the deck against changing grade, not one convenient measurement.

Ask the provider to show the deck and surrounding grade on the property information used for review. Identify any proposed grading as its own part of the work rather than changing the ground merely to fit an assumed exemption. Resolve the applicable City process using the actual finished arrangement and site changes.

Record the grade variation.

Have the provider establish the relevant existing levels and proposed platform relationship for the site.

Show stairs and ground changes.

Include the full access arrangement and any excavation or fill instead of describing only the platform’s highest ground point.

Confirm the complete review.

Ask Building and Public Works which requirements apply to the deck and associated site work.

Explore our full decks service →

Before work begins

Use the City deck guidance conditionally.

Sequim’s deck FAQ describes a height-based residential permit exception and notes that construction requirements and setbacks remain. Have staff confirm how the actual deck and grade are assessed.

No exemption, guard dimension, footing design or grading approval is determined by this page.

Review Sequim's project and permit resources →

Decks questions for Sequim homeowners.

Can I use only the uphill edge to describe the deck?

Have the actual platform and surrounding grade assessed using the City’s applicable method.

Does no building permit mean no construction requirements?

The City FAQ retains code and setback obligations; confirm the actual work with staff.

Can ground be raised just to assume a low-deck exception?

Have the designer and City assess any grade change as part of the complete proposal.

Discuss decks at your Sequim home.

Share the deck location, grade changes around it and any proposed excavation or fill.