State that replacement is not intended.
Identify the complete platform and associated elements proposed for removal so the estimate does not assume a new deck follows.
Decks · Snohomish, Washington
Decks in Snohomish sometimes need a removal proposal rather than a replacement design. If the platform is to disappear permanently, ask what finished condition will remain at the house and doorway before treating demolition as the whole project.
Evergreen Home Pro helps homeowners describe that intended outcome. Show the existing platform, house connection and affected door so the responsible provider can assess wall restoration, required landings or guards, and the household’s future access.

Deck construction
Make the removal-only intent explicit and have the affected house connection and access assessed together. A proposal that removes the platform should also explain how the remaining exterior and any doorway condition will be brought to the appropriate finished state.
Identify the complete platform and associated elements proposed for removal so the estimate does not assume a new deck follows.
Ask the qualified provider to describe the wall-restoration scope at removed connections and any conditions revealed during removal.
Have the responsible professional assess the resulting opening, applicable landing or guard requirements and the intended way in and out before work proceeds.
Before work begins
Snohomish’s current permitting FAQ includes demolition among work requiring a building permit. Describe the permanent deck removal and proposed remaining conditions to staff; do not infer an exemption because a new platform is not being built.
The January 2026 deck checklist also asks for elevations showing old and new decks, doors, landings and related elements. Ask staff which records apply to a removal-only proposal. This page supplies no demolition procedure or project-specific structural or code determination.
State the intended removal-only outcome so the provider can assess the remaining exterior and access instead of assuming a replacement.
Have the responsible professional assess the resulting door, landing, guard and access conditions as part of the proposal.
The city FAQ includes demolition. Describe the actual work and confirm the applicable submission with staff.
Send photographs of the platform, house connection and affected doorway. Ask for the removal, restoration and remaining-access responsibilities to be identified.