Provide the selected equipment information.
Have the HVAC provider supply the actual model requirements to the responsible electrical professional.
HVAC · Port Angeles, Washington
HVAC in Port Angeles needs an electrical-work boundary alongside the mechanical equipment proposal. Ask whether the selected installation uses the existing supply unchanged or needs an electrical provider to assess a new circuit, disconnect or service question.
Do not infer electrical capacity from an empty panel space or the size of the old unit. Have the responsible electrical professional assess the actual equipment requirements and existing system before an equipment-only bid is accepted as complete.

Heating and cooling
Request a written handoff between the HVAC and electrical providers. It should identify the selected equipment, included electrical work, applicant responsibilities and any unresolved service or utility question. Keep this assessment ahead of ordering when it can affect equipment placement or the installation date.
Have the HVAC provider supply the actual model requirements to the responsible electrical professional.
Ask which circuit, disconnect or supply changes are included and which service questions remain to be resolved.
Identify the mechanical and electrical applicants and the records each provider supplies before handover.
Before work begins
Port Angeles lists mechanical, single-family electrical and electrical-service applications. Have the responsible applicants confirm the categories and inspections needed for this installation.
This guide supplies no circuit size, panel-capacity conclusion or authorization for homeowner electrical work.
Have the electrical provider assess the actual system and selected equipment requirements.
Request the written scope and exclusions from both responsible providers.
Confirm the applicable inspection types and completion records with the applicants and City.
Share the proposed HVAC model and any known electrical-service questions.