Get a general ballpark estimate right away.
Roofing · Port Townsend, Washington
Roofing in Port Townsend should begin by identifying the existing roof and the review that applies to the building. The City posts an older HPC roofing list with a specific cedar-roof replacement purpose; ask staff how it relates to today’s proposal.
A product name found on that sheet does not establish current supply, a current model’s equivalence or approval for a different existing roof. Bring the actual roof description and proposed product to the discussion.

Enter your contact information to access the instant online calculator for a general ballpark estimate. You will use your property address to generate satellite-based roof measurements and estimate ranges with no obligation.
Roof replacement
Have the roofer document the existing covering and the proposed replacement system. If an older City roofing sheet is being cited, keep its date, stated scope and exact product reference with the inquiry. Ask PCD to confirm the applicable current review and have the supplier identify what is actually available. Resolve a changed product line through those parties before ordering. The accepted proposal should still define tear-off, repairs and the complete roof assembly rather than using a historical product listing as the entire construction specification.
Record the actual covering and supporting work being proposed.
Retain the date and stated purpose of any roofing list cited.
Ask City staff and the supplier to reconcile review and available product information.
Before work begins
Confirm the parcel is within the City and describe the roof, any structural change and the building’s applicable historic record. Ask PCD which current documents and review are needed.
Do not transfer a district-specific roof list to every City home. The property record, existing roof and actual proposal need their own review.
Have the supplier identify the actual current product and City staff confirm the applicable review.
Read its stated scope and ask how it relates to the actual building and covering.
The assessed roof assembly, removal, supporting repairs and installation responsibilities.