Describe all ground changes.
Mark new footings, removed paving, grading and related trenches. Give the reviewer the complete work description rather than only the roof dimensions.
Patio Covers · Yelm, Washington
Patio covers in Yelm that add footings or change ground surfaces should bring the entire parcel into the initial site discussion. A small roof outline does not by itself determine whether the City’s pocket-gopher screening process applies.
Bring a site sketch showing existing structures, paving, proposed supports and disturbed areas. Ask the City which current review and records apply before booking excavation around an assumed exemption.

Compare fixed acrylic-cover sizes and roof styles. Confirm the parcel review, support design and associated site work separately.
Choose a callback time if you want help with a more detailed estimate, or send the request without one.
Patio cover installation
The useful first step is a City determination for the actual proposal. Identify what remains in an existing footprint and what extends beyond it, with the work area and utility routes visible on the same sketch.
Mark new footings, removed paving, grading and related trenches. Give the reviewer the complete work description rather than only the roof dimensions.
Include existing structures and any prior site-review records. Ask which information remains valid and whether inaccessible portions need further assessment.
Identify who obtains any required assessment and which decision must precede excavation. Do not infer release from the apparent absence of animals or the size of the cover.
Before work begins
Yelm’s published pocket-gopher protocol describes staff screening and possible reasons for excluding a project from further field review. Ask staff to apply the current process to this cover and its associated ground work.
The public protocol contains dated references. Confirm current applicability, documentation and scheduling directly with the City; this page does not establish a survey requirement or exemption for any parcel.
Ask the City to classify the actual parcel and work. Roof area alone does not establish that determination.
Show the paving and proposed disturbance and ask staff which current provisions apply. Do not treat an existing surface as a self-certified exemption.
Use the City’s process and any required qualified assessment. Personal observations do not establish project clearance.