Inventory the changed surfaces.
Identify the proposed roof and any new or replaced terrace or walkway work in the same project. Ask Development Engineering which stormwater requirements the whole scope triggers.
Patio covers · Bainbridge Island, Washington
Patio covers in Bainbridge Island add a roof catchment to an outdoor area. Before extending a cover to the edge of a terrace, ask where that roof’s collected water can go and what the site review requires.
Treat the clear acrylic roof, supports and drainage route as one proposed layout. The calculator can help compare dimensions while those property decisions are being assessed.

Compare acrylic-cover dimensions while confirming the roof-water route and applicable site review.
Choose a callback time if you want help with a more detailed estimate, or send the request without one.
Patio cover installation
Mark the proposed cover outline on a site sketch and ask the provider to identify the outer gutter, downpipe and intended discharge arrangement. Compare widths and projections with that route visible. An existing patio drain or a convenient garden edge should be assessed before it is treated as the new roof outlet.
Identify the proposed roof and any new or replaced terrace or walkway work in the same project. Ask Development Engineering which stormwater requirements the whole scope triggers.
Have the responsible professional assess the route against slopes, soil, nearby structures and other site constraints. Ask for the basis of the selected arrangement rather than a promise that all water will disappear into the yard.
Request the included gutter and downpipe work and identify any separate drainage design or ground work. Revisit the arrangement if the cover footprint changes during ordering.
Before work begins
Bainbridge Island’s stormwater page explains that projects subject to MR #5 evaluate applicable on-site measures for new or replaced hard surfaces, including roofs. Ask Development Engineering to determine applicability to this project.
For applicable work, site constraints need documented evaluation; they do not automatically remove the requirement. Keep stormwater review distinct from structural approval of posts, roof connections and footings.
Have its suitability and destination assessed with the added roof catchment. Include any changed drainage work in the proposal.
The City ties applicable stormwater measures to site conditions and project requirements. Ask Development Engineering which evaluation applies.
Use it for an initial acrylic-cover comparison. Obtain a written project quote identifying gutters, discharge arrangements, permits and any separately designed site work.