Separate surface and structure.
Identify boards, guards, framing, posts and footings individually in the proposal.
Decks · Brinnon, Washington
Decks in Brinnon may begin as a request to replace the walking surface. Before pricing that work, identify whether the proposal also relies on existing posts, footings, beams or the connection to the house.
An existing deck shows where a structure has stood; it does not establish that every concealed part is suitable for a new design. Bring available plans and describe any known water or movement history.

Deck construction
Ask the deck provider to mark each component as retained, replaced or awaiting inspection. Have the responsible designer assess the retained construction against the proposed deck, including changed materials, stairs or loading. Agree how concealed connections and support conditions will be inspected and documented. If findings change the scope, pause for the necessary design and approval rather than rebuilding around an unexplained allowance. Keep the assessed support arrangement with the final drawings so the price covers a defined structure.
Identify boards, guards, framing, posts and footings individually in the proposal.
Ask the responsible provider to document the support and house connections that remain.
Establish who assesses unexpected damage and authorizes a revised design.
Before work begins
Use the County deck application to explain the actual rebuild. Ask DCD what records and current review apply when the footprint, supports or connections are retained or changed.
For a property with mapped flood concerns, include the existing and proposed configuration in the inquiry. Keeping old footings does not itself settle floodplain or building review.
Have the provider inspect and document the retained components separately from the walking surface.
Have the responsible designer assess the existing supports against the actual proposed structure.
Use the agreed inspection and change procedure, including necessary design and reviewing-authority decisions before rebuilding.
Share available drawings, photos, known movement or water history and the components you hope to retain so the provider can assess the complete replacement.